Dowlow Halt | |
---|---|
Location | |
Place | Brierlow Bar |
Area | Derbyshire |
Grid reference | SK086690 |
Operations | |
Original company | Cromford and High Peak Railway |
Pre-grouping | London and North Western Railway |
Post-grouping | London, Midland and Scottish Railway |
Platforms | 2 |
History | |
1894 | Opened |
1 Nov.1954 | Closed |
Disused railway stations in the United Kingdom | |
Closed railway stations in Britain A B C D–F G H–J K–L M–O P–R S T–V W–Z |
|
Dowlow Halt was opened in 1894 at Dowlow, near to Brierlow Bar to the south east of Buxton, Derbyshire on the London and North Western Railway line to Ashbourne and the south.
Contents |
The line utilised part of the Cromford and High Peak Railway (which ran from Whaley Bridge to Cromford) joining it at Hindlow and proceeding to a branch to Ashbourne at Parsley Hay.
After leaving Hindlow the line began to climb at 1 in 60 through Hindlow Tunnel to Brigg's Sidings and its summit at Dowlow Halt. 1,260 feet (380 m) at the summit, this was the highest main line in England at the time. From Dowlow Halt the line travelled downhill at a gradient of 1 in 60 to Hurdlow.
Brigg's Sidings served Messrs. Briggs and the Dowlow Lime and Stone Company (later Steetley, then Redland Aggregates).
The halt itself was unstaffed with two short stone platforms and without buildings, since it was initially used by workmen's trains for the nearby works. It was opened for public services in November 1929. Passenger services on the line finished in 1954.
One section still exists, serving Buxton Lime Industries, and terminating a short distance further on at the Lafarge Dowlow sidings.[1]